How the system is built
The floor starts with mechanical preparation. We diamond grind the slab to open the surface so the coating bonds into the concrete instead of sitting on top of it, then repair cracks, pits, and spalled areas with a patching compound. Next comes the pigmented base coat, and while it is still wet, we broadcast flake to refusal across the entire surface. Once it cures, the excess is scraped and vacuumed off and the floor gets one or two clear coats. That topcoat is what carries the wear.



